Maintaining the Village – this area of the website is currently under construction

The Parish Council have arrangements  in place with

To find out more about these services please click on each of the links above.

Footpaths

The Countryside Access officer at Dacorum Borough Council heads up the department responsible for public footpaths.  The officer liaises with the Parish Council from time to time about the condition of public footpaths.

Foot path from Bede Court to Ringshall Drive

Dacorum Borough Council are responsible for the maintenance of the footpath running from Bede Court to the pub and from the Pub to Ringshall Drive.  These two paths are mowed once a year in the summer.  Hedgerows and foliage whose roots are in the land abutting these paths are the responsibility of the landowners to keep cut back to allow safe passage.

Keeping footpaths in the village clear for safe use

It is the responsibility of the owners/occupiers to prevent their vegetation from interfering with the use of footpaths and highways.

Overhanging vegetation can cause a problem for pedestrians and users of the footpaths and highways.    It is apparent that many residents hedges and borders need more than a light trim to remove vegetation which has encroached onto footpaths and highways. 

Hedges should only be cut outside of bird-nesting months.  Nesting months are typically between March and August every year.   

Hertfordshire County Council are responsible for the highways, including pavements.  Issues should be reported direct to Herts here.

Hudnall Lane Flooding 

From time to time Hudnall Lane gets flooded in the dip in the part of the lane closest to the Village Green.   Locals refer to it as the Hudnall Ford.   To reduce this an underground chamber was installed.  From time to time this chamber and the southern most culvert needs to be cleared of silt.  Please report issues to HCC here.

Nettleden Road North Flooding near Old Paddock Cottage and Beaney Bend

From time to time the drains are blocked in the vicinity of Beaney Bend.affecting the highway and properties in the area.  The drain located at flows into the field behind and it is important that the pipes are fully cleared to allow the flow down the incline into the field.

Remembrance Soldiers

The Soldiers are installed on the Village Green by the RBL and village volunteers in November and are usually stood down and removed within two weeks after Remembrance Sunday to allow for the installation of the Christmas Tree.

Volunteers from the RBL also assist with traffic management on Remembrance Sunday to assist with the Service.

 

The Village Christmas Tree

Each year the Parish Council votes on whether to provide a Christmas Tree for the Green.  If approved the Christmas Tree is installed for 1 December and removed for 6 January.